Overview
Every
industrial plant β whether itβs a refinery, steel mill, or
manufacturing unit β relies on robust piping, electrical conduits,
and safety systems.
WavesVis SmartInfra supports industrial
and process facilities with comprehensive procurement solutions
for mechanical, electrical, and fire-safety materials,
ensuring reliable operations and maintenance.
Our goal is simple: to help industries focus on production, while we manage the complexities of material sourcing, standard compliance, and logistics.
1. Process & Utility Piping
HDPE, MS, GI, and stainless steel piping for water, air, gas, and process lines
High-pressure fittings β elbows, reducers, tees, flanges
Customized MS fabrications for line modifications
Rubber and GI-coated joints, couplings, expansion joints
2. Cable Management Systems
Ladder-type and perforated cable trays (GI / aluminum)
Raceway systems with junction boxes
Conduits and trunking for instrumentation cables
Support hardware β angles, C-channels, brackets
3. Fire & Safety Networks
Fire-water mains and hydrant valves
Hose reels, branch pipes, sprinklers, and monitors
Diesel/electric fire pumps, controllers, and pressure systems
Cabinet assemblies and accessories
4. Structural & Fabrication Support
Platforms, handrails, staircases, and access systems
Base plates, U-clamps, and supports for heavy pipelines
Protective coatings (HDG / epoxy / zinc-rich primers)
Thermal & Gas Power Plants β cooling-water, fuel lines, and fire systems
Chemical & Petrochemical Plants β process piping and safety fittings
Cement & Steel Industries β compressed-air, water and cooling systems
Manufacturing Units β utility piping, electrical conduits, cable trays
Industrial Parks & SEZs β common utilities and stormwater systems
Multi-category supply under a single PO
Rapid sourcing through verified OEM partners
Standardization per IS, BIS, or client-specific QAPs
Pre-dispatch inspection and certification
Site-based delivery and sequencing
Example:
For a fertilizer plant in Gujarat, WavesVis delivered a consolidated package including 18 km of HDPE pipe, 400 valves, and 15 tons of cable trays β delivered in three staggered consignments aligned to civil completion milestones.